Our T 460 truck-mounted elevated work platform provides exceptional reach capacity and multifunctional work basket to support safe and efficient completion of works. This crane truck provides 31m lateral reach and 46m vertical reach, with the ability to work up to 8m below ground level.
Working up to 46 metres above and 8 metres below ground level possible
Work platform lift limit of 44m, equipped with lifting arms to safely lift a combined weight of 600kg
Capable of lateral reach up to 31m with 100kg basket load
180 degrees swivelling angle of upper boom to support multiple scenarios and angle of approach
Total vehicle length of 10.4m
Generous platform dimensions and 600kg load capacity
The Salt Creek Wind Farm uses 15 wind turbines and produces about 172GWh of clean energy each year. This has the potential to power more than 30,000 homes. Skydeck Australia were responsible for assisting in the construction of approx. 50.5km of 66kV powerline from Mortlake to Terang Terminal station. The project was put into service on Monday, June 4th 2018. Construction cost approx. $105M